Automatic Boat Landing System
Automatic Boat Landing System In July 2019 Van Oord installed ...
Heerema Marine Contractors – Pipelay simulator
Delivery of Pipelay Simulator Client: Heerema Marine Contractors Challenge: Create ...
Heerema Marine Contractors – Pipelay Equipment
KENC was asked to do a complete redesign of the Quad and Hex shelters. These shelters provide the working areas for all deck pipe lay production operations on board the DCV Balder, such as bevelling, welding, weld inspection and coating.
Van Oord – Subsea Rock Installation Equipment
On board the FFPV Stornes buckets were launched and recovered, requiring a lot of manual handling, thereby increasing the risk of accidents. Van Oord asked KENC to come up with an automated system to replace its manual handling operations.
Jumbo – Grillages and handling equipment
The assignments included engineering of a 192 tonnes gypsy winch grillage and an over boarding tool to handle 120t torpedo piles.
WHO WE’VE BEEN WORKING FOR
LET’S FIND OUT WHAT WE CAN DO TOGETHER
We love to hear from you! Give me a call or send an e-mail.
Vincent Vinkoert
Business Development Manager
+31 6 308 469 86 | vincent.vinkoert@kenc.nl